THE ST JAMES RAILWAY TUNNELS ---------------------------- Some historical notes During the 1890's there was much discussion about a possible extension of the railway from the then Sydney Terminal Station at Devonshire Street into the city proper. This would enable city workers to travel direct to the city by train and avoid the necessity of changing to a stream tram to complete their journeys. A number of enquiries were held and various schemes were proposed for a city railway, inlcluding plans for an above ground steam railway to Circular Quay, and another for a huge rail terminal in Hyde Park. The plan ultimately adopted was concoted by Dr J.J.C.Bradfield who designed an elaborate electric railway system to serve the city and suburbs. As with all schemes adopted by governments, there have been many changes to the original concept, and much of the proposal has never been completed. Some of the Bradfield ideas which have seen fruition are the building of the present underground railway system (which, with the exception of the present Eastern Suburbs Railway, constituted only a part of Bradfields' city proposals), the building of lines to Cronulla and East Hills, the completion of the Bankstown - Regents Park - Cabramatta - Lidcombe network, the construction of the metropolitan goods lies system, and, of course, the construction of the Sydney Harbour Bridge, although not to the plans originally submitted. Ideas which await completion or which have been discarded include railways from North Sydney to the Northern beaches, St Leonards to Epping, Central to Matraville / Sydenham and Town Hall to Gladesville. Construction of the present City Railway was part of the master plan, and as each stage was brought into use, sufficient construction work was completed to enable extensions of the system to be made at a later date without interference to the service already provided. Thus, at North Sydney, there are tunnels leading perhaps half a kilometre towards Mosman for the Peninsula Railway. At Town Hall, additional platforms were porvided at the Low Level for the line to Gladesville. (These are now used by the Eastern Suburbs Railway.) Even in the 1970's with the construction of the Eastern Suburbs Railway (to a route quite different from Bradfield's proposals), two additional platforms and short sections of associated tunnels were constructed at Central for the Southern Suburbs Railway to Mascot, just in case it was ever decided to build it. These platforms are above the ESR platforms, and their presence explains the surprisingly long escalator trip down to platforms 24 and 25. -=-=- The original city railway proposals saw St James as a busy junction and changeover point. In addition to the City Circle lines now in use, an additional double track railway was to be built from Gladesville via the City to Watson's Bay and the South Eastern suburbs. This line was to enter the city from the west over Darling Harbour (somewhere near the present Distributor bridge), run underground and curve around from Town Hall, under O'Connell Street, to St James, where it would utilise the two spare centre platforms. There were to be two sations run under Hyde Park and Oxford Street to Taylor Square, where there was to be a junction. One pair of lines was to go to Watson's Bay, and the other through Paddington and Randwick towards Botany. At St James, there were to be crossover junctions to enable exchange of trains between the Gldesville / Eastern lines and the City Circle. The first section of the city railway was opened in 1926, from Cleveland Street to Central Electric station. The section on to St James was opened a few months later. It was, from the start, available for electric trains only, and the first service ran between Central and Oatley. This was extended to St James when that section of the line was opened for traffic. During the next couple of years, the electrification expanded rapidly, reaching Sutherland, Liverpool, Parramatta, Bankstown and Hornsby by 1929. Progress then slowed until outer suburban development required extension of the electrified system to Penrith in 1955, Lithgow in 1957, Cowan in 1959, Gosford 1960, Campbelltow in 1968, Waterfall 1980, Wyong 1982, Newcastle 1984 and Wollongong in 1985. Branch lines have been electrified as the traffic warrants. Not all the electrification works were for commuter trains -- the Western Line in particular was electrified to handle heavy coal traffic expected from collieries at Wallerawang. This traffic did not eventuate and the electrification was halted at Bowenfels, just west of Lithgow. The new Central station stood on part of the 1906 Sydney Termial, some platforms and a goods yard having been abolished to make way for it. The four lines to Wynyard were opened in 1932, and the lines across the Bridge to the new Milsons Point and Waverton opened shortly after. Four lines were provided between Wynyard and North Sydney, although two of these were used by trains until the closure of the North Shore train netwok in 1958. The bridge tramway space is now used by the Cahill Expressway. From 1932 until 1956, many trains terminated in the City; only those to North Sydney ran through. Wynyard Low Level and St James were busy terminals until 1956 when these two stations were connected by the line through Circular Quay, allowing trains to run into the City and back out again without having to stop and reverse direction. -=-=- As mentioned earlier, St James was intended to be one of the focal points of the City operations, and, incidentally, of this paper. St James was built, as was much of the City Railway, by the cut and cover method. In this way, a large hole was dug in the ground, walls were built, a roof provided and the rest of the hole filled in. The outer two platforms were for the trains travelling to and from Circular Quay and this is their current use. The inner two platforms were for trains travelling to and from the Watsons Bay / Randwick area (then referred to as the Eastern Suburbs Railway). These have never been used for trains, although the tunnels existed from St James for some distance in either direction. The tunnels were built around to Circular Quay, although it was to be another thirty years before they were used for passenger trains. As St James was to be the terminal point, for the time being at least, of all trains on that section of the line, facilities were provided for the rapid handling of traffic. Two dead end sidings were provided at the Circular Quay end, between the two tunnels which run through to Circular Quay. A train would arrive at St James, passengers would detrain, and the train would proceed into one of the sidings. There the driver would change ends while the next train was unloading at the platform. The first train would then run back to St James, this time via the departure platform, and load. In this way, four trains could be handled simultaneously -- one unloading, one loading and one in each siding. In busy times, the outgoing driver actually boarded the back of the train when it arrived at St James in readiness to drive the train out of the terminal siding. This saved the delay incurred whilst one driver walked from one end of the train to the other. A signal box was provided to control this working, although when times were quiet, points and signals could operate automatically. In 1936, the track ultimately to carry trains from Circular Quay to St James (known as the City Outer) was built from St James as far back as the tunnel portal at Circular Quay. This line was used for the storage of trains between the peak hours. During the Second World War, the unused St James to Circular Quay tunnel and those intended for the Eastern Suburbs Railway at the Museum end, were converted to bomb shelters in case Sydney sufferered an air raid. The bomb shelters were removed from the Circular Quay tunnel for the building of the line in 1956, but remain at the Museum end. The extension of services to Circular Quay meant that trains were no longer required to terminate at St James as a matter of course, although the two sidings and the signal box were retained for use in emergencies. One or two trains normally terminate each week day at St James, partly to keep the staff conversant with the operating procedures and partly to keep the sidings rails polished. The latter is necessary as good electrical contact is required between the rails and the wheels of the train to maintain `track locking' -- a system which detects the presence of a train and prevents points being moved under it. Recent emergencies which have entailed heavy train termination at St James have included a bomb scare at Wynyard and flooding of other sections of the City Railway. -=-=- The signal box and sidings were out of use for about a year in 1985-6 due to the working of the asbestos train. This work train occupied one or other of the city lines in the evenings, when the St James terminators ran. It was not possible therefore to use the sidings on a regular basis, and the rails became rusty. It was not considered safe therefore to leave the facility available for use when the operating conditions were ideal for derailments, and the main line points were clipped out of use. When the asbestos working ceased, the St James signal box was once again brought into use. The terminal sidings occupy a double line tunnel located, as mentioned before, between the two single line tunnels in use by circle trains. This tunnel curves to the right and drops quite sharply along its 250 metre length. At its end, it is very much lower than the City Inner railway line to its left, and the original purpose of the exercise was that the double line tunnel, to lead eventually to Town Hall and the Western Suburbs, would pass under the City Inner Line. At the sidings, directly under the Mitchell Library, there is a rock face and a small pilot tunnel at roof level. It is felt that this rock face, about 25m across, coincides with Shakespeare Place, and that, when the tunnels were being dug, the Shakespeare Place excavation was for some reason left until later. Through the pilot shaft blows, on occasion, a tremendous gale generated by trains passing through adjacent tunnels, and coping with this blast of air standing at the top of a ladder or bent double in the pilot shaft can be an interesting exercise. At the Quay end of the pilot tunnel is another double line tunnel, with a concrete arched roof, but sandstone walls. This tunnel stretches away in a left hand curve towards Bridge Street. It passes under the City Inner Line and starts a tight arc which would ultimately have led to Town Hall, but avoiding Wynyard. Construction ceased after suficient tunnel had been built to clear the City Inner Line, the end being probably about where it would go under Macquarie Street. It is possible to enter this tunnel, but flooding prevents much progress. Because the tunnel falls away, the water is about 5 - 6 metres deep at the Circular Quay end, becoming shallower the closer you are to St James. At this end, a drain leads the water into the existing underground drainage system, so the water level will not increase further. At the entrance to this flooded tunnel, at the end of the pilot tunnel, is a vertical shaft leading upwards. In the days of bomb shelters at this end, a dizzy zig zag stair case used to lead up this shaft to a pill box in Shakespeare Place. The staircase and pill box have long since been removed. There are signs of other tunnels leading off this shaft, and it is not known where these lead to. There are persistent rumours that General Macarthur had his wartime headquaters somewhere in this area, but there are now no signs of this activity. Indeed there are so many theories on places where MacArthur had his base that the man could not have possibly used them all. Of interest, however, is the fact that in the late 1960's, there was a large fire in disused railway tunnels at St James. So large was the fire that smoke closed the railway for some hours. Yet in the tunnels accessible these days, there is little sign of any fire damage **. MacArthur may well have operated out of St James from a section now boarded off, or from the City Inner tunnel which was not then in use for trains. -=-=- Complicating the story of this section was the building of the Cahill Expressway in the early 1960's, and this may have obliterated some traces of earlier workings. The Eastern Suburbs railway tunnels at the Museum end of St James station are not so complicated in their history. Not one has ever seen a train, and it is most unlikely that they ever will, as the ESR has been built to quite a different plan. It actually crosses underneath St James at right angles just north of the platform. A blast curtained opening leads into a double track tunnel almost immediately on the Museum side of the station. Like the spare tunnels at the Circular Quay end, this tunnel is located between the two currently in use for rail traffic. They are also on a fairly stiff gradient, this time upwards. After a short distance, the double line tunnel becomes two parallel single line tunnels, still rising sharply. In this way, they rise up over the top of the City Outer tunnel, in the direction of Taylor Square. Again, just enough tunnel was built to ensure that rail traffic would not be disrupted when construction resumed. The tunnels end in a barricade under Hyde Park, about level with, but well to the East of, Museum Station. Behind the barricades can be seen rocks piled up wher the hole in the ground construction ended. The existence of this tunnel system can easily be noted by watching trains arrive at and leave Museum at the St James end. The reverse curvature of the tunnels in use now to get around the tunnel between them is obvious. The double line tunnel is divided into a number of bomb shelters, each divided by a solid transverse wall from floor to ceiling. Access between the shelters is via a concrete blast curtain, with a similar curtain higher up for ventilation. Each shelter would be about 30m long. The single line tunnels have for a short distance also been divided into bomb shelters, again with transverse concrete dividers, and there is blast curtained cross access between the tunnels. Further along the tunnels, the blast curtains have been removed for some reason, and the remains of mass concrete and reinforcing rods make walking difficult. In some of the tunnel, tree roots from Hyde park above have pierced their way through drainage holes and run down the walls and across the floor. In one tunnel, they hang from the roof and are festooned by cobwebs; by torchlight, the effect can be splendidly eerie, especially if you walk into one without seeing it. As there have been a number of inspections recently, the number of cobwebs has diminished somewhat. At the Museum end of these tunnels, a great deal of graffiti has been scrawled on the walls, much of it recent. However, careful searching can find the pencilled names and serial numbers of soldiers, who, it is assumed, were involved in 1942 with the construction of the bomb shelters. The Eastern Suburbs Railway as envisaged by Bradfield will now never be built, and these tunnels are unlikely ever to see a train. Likewise, it seems most unlikely that the Western Suburbs railway will ever be built. Much of the tunnel constructed for it is flooded, its platforms at Town Hall have been utilised for the present Eastern Suburbs Railway, and all it has ever seen is the slow moving of shunting terminating electric trains. St James itself has seen a decline. Its lines are more in keeping with another age. The busy days of terminating trains and the shouts of `all change' have gone. And the 1979 opening of the Eastern Suburbs Railway was ultimately to rob St James of much of its through traffic, as all main line Illawarra services - the Mortdale, Cronulla, and Waterfall services now run to Bondi Junction. Outside of peak hours, St James has become almost a backwater of the busy rail system. For those interested, group tours of St James, lasting about an hour and a half can be arranged through the Australian Railway Historical Society, telephone 212 1201. ** Ed. example of fire damage found on wooden poles, top of narrow passage between the shunting yards and the underground lake near Shakespeares Place. These pylons appear to reinforce the concrete roof of the shunting yards. -=-=-=-=-=-=-=-=-=-=-=-=- AUSTRALIAN RAILWAY HISTORICAL SOCIETY ST JAMES INSPECTIONS Preliminary Notes for Inspection Groups IMPORTANT NOTE As trains now operate into the terminal sidings around the times of the inspections, the Society and State Rail Authority cannot guarantee that the inspections will proceed. Late or out of course running of these trains could cause last minute disruption to or canncellation of the inspections, and your group may arrive at St James to find that due to these circumstances, the inspection is unable to proceed. We sound this warning, but you should note that to date, all Society inspections at St James have run without problems. MEETING POINT The group will meet at the Station Master's office at the appointed time. The Station Master's office is located on the station concourse at the Museum or southern end, opposite the refreshment kiosk. Any parcels or coats may be left in this office. CLOTHING Please wear old clothes and sound footwear. Some of the walking is a little rough underfoot, and can be muddy in places. The pilot tunnel at the Circular Quay end is filthy, and people tend to get dirty at this point of the inspection. As drainage problems occur, please come prepared to get wet to your ankles if the bomb shelters are flooded. LADDERS You may be aware that part of this inspection involved climbing ladders in semi-darkness. Please do not let this put you off coming. The group returns the same way it enters the tunnels, and anybody who does not wish to climb the ladders, or who feels claustrophobic, may wait for the group to return. PHOTOGRAPHY You are welcome to take photographs; a flash will be necessary. Apart from the usual courtesies to the other members of your group, you are, however, asked not to take photographs of trains, as the unexpected flash can startle the train drivers who are normally not advised of the inspections. *** RUNNING LINES It is a condition of the inspection that members of parties obey all directions of the guide, and in particular that nobody crosses or stands on the main running lines. We have never had an accident at St James, and would hate anyone to come in contact with a moving train. At one or two points in the inspection we are quite close to the main lines, so care is essential. INDEMNITY FORMS The State Rail Authority requires all persons participating in inspections of railway premises to sign a form indemnifying the SRA against any claims for any accident or injury. The Society also requires such indemnity. Prior to commencement of the inspection, each member of the party will be asked to sign a form. SIZE OF GROUPS Because of the limitations of the ladders, and the time taken by groups to traverse the pilot tunnel, we prefer groups not to exceed around 15 people. If you have more than 15 people wishing to inspect St James, we can arrange for the group to be divided and to use a second guide. TORCHES We prefer each member of inspection parties to bring and carry a torch. CONTACT The contact officer for St James tours is Graham Harper, telephone 268 2926 or 212 1201. Should you encounter any late changes or difficulties, please ring Graham on these numbers. We hope you will enjoy your inpection. GH10/87 *** Ed. a rail historical society tour was once reported inspecting the tunnels -- a train driver not knowing their purpose reported this on radio, and State Rail police soon descended upon them; it is a good idea to carefully keep out of sight of passing trains when inspecting the tunnels -=-=-=-=-=-=-=-=-=-=-=-=- LEGALESE: (Read This) Indemnity Form Copies Available from State Rail, St James Stn Masters Office (It is all one sentence - pompous lawyers ought to learn some grammar.) INDEMNITY FORM I, _____full name___________ of ____full address incl_______ postcode______ in the State of New South Wales HEREBY REQUEST the State Rail Authority of New South Wales (hereinafter called the Authority) to permit me on ____ date______________ to enter premises for _______________________________________ AND in consideration of being granted such permission I AGREE that in entering being upon or leaving such premises I do so entirely at my own risk and that neither the Authority nor any of its employees shall be responsible for any injury or loss howsoever caused that I may sustain whilst entering being upon or leaving such premises AND for the consideration aforesaid I FURTHER AGREE that should I sustain injury howsoever caused whilst so entering being upon or leaving such premises in pursuance of such permission as aforesaid and such injury results in or contributes to my death no compensation shall be recoverable from the Authority or any of its employees by my executors adminstrators dependants or relations or any other person claiming through or under me AND for the consideration aforesaid I FURTHER AGREE that should the death of any person ensue or any damage injury or loss be occasioned to any person or thing or any property of the Authority or its employees by reason of anything suffered or done or omitted to be suffered as done by me whlst entering upon or leaving such premises in pursuance of such permission as aforesaid whether such death damage injury or loss be occasioned either directly or indirecty or with or without any default or negligence on my part I WILL INDEMNIFY the Authority or any of its employees from and against any claim that may be made against it or them or any damage or loss incurred or suffered by it or them as theresult of such death damage injury or loss and any costs or expensers incidental thereto and will accept as final an assessment by the Authority or by any person duly authorised by it in that behalf of the said damage or loss AND I ALSO AGREE AND UNDERTAKE to comply with every direction given to me whilst entering being upon or leaving such premises in pursuance of such permission as aforesaid by any person on behalf of the Authority AND I ADMIT the right of the Authority to withdraw this permission at any time without notice. DATE this _______________________ day of _____________ 19____ SIGNED in my presence by the said ___________________________ Witness ______________________________